TEPCO has a two phase plan to stabilize the Fukushima Daiichi Nuclear Power Plant. As explained at a news conference on Sunday by chairman of Tokyo Electric Power Company, Tsunehisa Katsumata:

Phase One - 3 months

-build new cooling systems outside Units 1 and 3 to cool down fuel

- patch the damaged section of Unit 2 reactor to contain radioactivity leakage

Phase Two - 3 to 6 months

Fukushima Extended Evacuation Zone _52184445_graphic - lower the temperature of the nuclear fuel in all reactors to below 100o Celsius

- cover the reactor buildings with giant covers with filters to prevent the release of radioactive substances into the air.

- set up equipment to purify contaminated water in tanks and other facilities.

- increase the number of monitoring points within the government-set evacuation areas

- neutralize the radioactive substances in soil and on buildings in the evacuation areas

Source: NHK